| View Issue Details [ Jump to Notes ] | [ Issue History ] [ Print ] |
| ID | Project | Category | View Status | Date Submitted | Last Update |
| 0002625 | Kdenlive | User Interface | public | 2012-05-27 01:52 | 2012-05-27 01:52 |
|
| Reporter | evorster | |
| Assigned To | | |
| Priority | normal | Severity | minor | Reproducibility | always |
| Status | new | Resolution | open | |
| Platform | x86_64 | OS | Linux | OS Version | 2.3.18 |
| Product Version | Recent git | |
| Target Version | | Fixed in Version | | |
|
| Summary | 0002625: Changing project framerate messes up project timings |
| Description | I have a video camera that does 1080p, 50fps. If I do a project in 50fps, and then decide to render the video to DVD, for instance, I am forced to change the framerate of the whole project.
When I do this, the clips in the timeline are subtly moved. None of the transitions line up with the clips either. |
| Steps To Reproduce | Do project in 50fps.
Change to 25fps. |
| Additional Information | I know I could just render to 50fps, make a new project with 25fps and load the 50fps video and transcode like that, but the extra step is annoying.
Maybe there should be a field in the render options where one could specify the output fps? |
| Tags | No tags attached. |
|
| Build/Install Method | Manual build from Git |
|
| Attached Files | |
|